This map will progressively contain all current and projected known single point source locations of CO2e emissions in WA.1995 Total net emissions for WA were 55.3 MTPA2002 Total net emissions for WA were 65.9 MTPA [Ref: Western Australian greenhouse strategy (Sep 2004), p. 21]1990 Total net emissions for WA were 58.8 MTPA2000 Total net emissions for WA were 65.6 MTPA2009 Total net emissions for WA were 69.8 MTPA[Ref: National Greenhouse Gas Inventory http://ageis.climatechange.gov.au]Progress total for proposed projects so far added to the map 76.3 MTPA (using the lower figure where a range is quoted)


0: 0.016 MTPA Alkimos waste water treatment plant site A or B
Ver detalle
1: 12–39 MTPA BLNG Precinct
Ver detalle
2: 8.391 MTPA Woodside North West Shelf Joint Venture
Ver detalle
3: 1.538 MTPA Burrup Fertilisers Pty Ltd (BFPL)
Ver detalle
4: 0.084 MTPA Burrup Nitrates Technical Ammonium Nitrate Plant (Under Consideration)
Ver detalle
5: 4.1-8.2 MTPA Woodside Pluto (Under Construction)
Ver detalle
6: 5.45-9 MTPA Gorgon (Under Construction)
Ver detalle
7: 0.864 MTPA Varanus Is processing hub
Ver detalle
8: 0.33 MTPA Barrow Island, oil
Ver detalle
9: Thevenard Island, oil processing hub
Ver detalle
10: 2.3 MTPA Prelude FLNG Project (Under Development)
Ver detalle
11: 3.0 MTPA BHP Billiton Scarborough LNG
Ver detalle
12: 0.125 MTPA Devil Creek (Under Construction)
Ver detalle
13: Browse Basin; Argus, gas
Ver detalle
14: Browse Basin; Brecknock, gas
Ver detalle
15: Browse Basin; Calliance, gas
Ver detalle
16: Browse Basin; Cornea, oil
Ver detalle
17: Browse Basin; Crux, gas
Ver detalle
18: Browse Basin; Gwydion, Gas/oil
Ver detalle
19: 7 MTPA Browse Basin; Ichthys, gas
Ver detalle
20: Browse Basin; Torosa, gas
Ver detalle
21: 0.58 MTPA Dyno Nobel Explosives (Under Consideration)
Ver detalle
22: 0.59 MTPA NewGen Neerabup Pty Ltd 330MW Gas-Fired Power Station
Ver detalle
23: 2.7-5.6 MTPA Balmoral South Iron Ore Project (Under Construction)
Ver detalle
24: 2.6 MTPA Collie; Bluewaters Power Station & Phase II
Ver detalle
25: 3.1 MTPA Collie; Bluewaters Power Station Expansion Phases III and IV
Ver detalle
26: 1.3 MTPA Collie; Muja A&B refurbishment
Ver detalle
27: Collie; Muja C&D - see Verve Energy
Ver detalle
28: Collie Power Station - see Verve Energy
Ver detalle
29: 1.971 MTPA Collie B
Ver detalle
30: 4.5 MTPA Collie; South West Power Project
Ver detalle
31: 10.328-15 MTPA Wheatstone
Ver detalle
32: Van Gogh project, oil
Ver detalle
33: 3.4 MTPA Perdaman Chemicals and Fertilizers
Ver detalle
34: 4.227 MTPA Coolimba Power station
Ver detalle
35: Agnew (Gold Fields Ltd)
Ver detalle
36: 0.049 MTPA Argyle, diamonds
Ver detalle
37: 0.034 MTPA Australind Titanium dioxide plant
Ver detalle
38: 0.337 MTPA Balla Balla Magnetite
Ver detalle
39: 0.392 MTPA Binningup Southern Seawater Desalination Project (under construction)
Ver detalle
40: 0.22 MTPA Boddington Gold Mine - extended basement operation
Ver detalle
41: 0.111 MTPA Brockman Syncline 4 Iron Ore Project
Ver detalle
42: 0.105 MTPA Cape Lambert Port B
Ver detalle
43: 2.188 MTPA Cape Preston - Iron Ore Mine, Downstream Processing (Direct-reduced and Hot-briquetted Iron) and Port, Cape Preston, WA
Ver detalle
44: 0.04 MTPA Carina Iron Ore Project
Ver detalle
45: Abra Deposit, Mulgul Project
Ver detalle
46: Windimurra V Fe
Ver detalle
47: Leinster; Waterloo, nickel
Ver detalle
48: Laverton; Mt Windarra, nickel
Ver detalle
49: Leonora; Navigator, gold
Ver detalle
50: Kalgoorlie; Carnegie, gold
Ver detalle
51: Kalgoorlie; White Foil, gold
Ver detalle
52: Kalgoorlie; Blair, nickel
Ver detalle
53: Kambalda; Beta-Hunt, nickel
Ver detalle
54: Kambalda; Carnilya Hill, nickel
Ver detalle
55: Kambalda; Spargoville, nickel
Ver detalle
56: 0.2 MTPA Kambalda; St. Ives, gold
Ver detalle
57: 0.187 MTPA Ravensthorpe nickel
Ver detalle
58: Gullewa, gold, copper
Ver detalle
59: 0.103 MTPA Warramboo Iron Ore Project
Ver detalle
60: Ant Hill, Sunday Hill. Manganese
Ver detalle
61: Balline Garnet mineral sands project
Ver detalle
62: Barrambie, vanadium
Ver detalle
63: Beyondie Iron project
Ver detalle
64: West Angelas Iron
Ver detalle
65: Bindoon North alumina
Ver detalle
66: Kanowna, Black Swan, nickel
Ver detalle
67: 0.057 MTPA Kanowna; Cawse, nickel
Ver detalle
68: Bonaparte Basin; Blacktip gas
Ver detalle
69: Bonaparte Basin; Audacious, oil
Ver detalle
70: Bonaparte Basin; Cash-Maple, gas
Ver detalle
71: Bonaparte Basin; Challis/Cassini, oil
Ver detalle
72: Bonaparte Basin; Frigate, gas
Ver detalle
73: Bonaparte Basin; Petrel, gas
Ver detalle
74: Bonaparte Basin; Tenacious, oil
Ver detalle
75: Bonaparte Basin; Tern, gas
Ver detalle
76: Canning Basin; Blina, oil
Ver detalle
77: Bounty, gold
Ver detalle
78: 0.02 MTPA Bronzewing-Mt McClure, gold
Ver detalle
79: Canegrass, magnetite
Ver detalle
80: Canegrass, nickel cobalt
Ver detalle
81: 0.362 MTPA Capel; Synthetic rutile
Ver detalle
82: Pardoo, iron
Ver detalle
83: Wodgina, iron
Ver detalle
84: Wodgina, tantalum
Ver detalle
85: Blina, diamonds
Ver detalle
86: 0.115 MTPA Macedon, gas
Ver detalle
87: 0.035 MTPA Cliff Head, oil
Ver detalle
88: 0.511 MTPA Cloud Break, iron ore
Ver detalle
89: 0.027 MTPA Ellendale, diamonds
Ver detalle
90: 1.141 MTPA Munster, cement manufacture
Ver detalle
91: 0.078 MTPA Dongara, lime
Ver detalle
92: Kwinana Power Station ... see SWIS
Ver detalle
93: Cockburn Power Station ... see SWIS
Ver detalle
94: Kemerton Power Station ... see SWIS
Ver detalle
95: Mungarra Power Station ... see SWIS
Ver detalle
96: West Kalgoorlie Power Station ... see SWIS
Ver detalle
97: Pinjar Power Station ... see SWIS
Ver detalle
98: Geraldton Power Station ... see SWIS
Ver detalle
99: Kwinana Tiwest Co-generation Plant ... see SWIS
Ver detalle
100: South West Co-generation JV ... see SWIS
Ver detalle
101: 3.18 MTPA Prescribed burns
Ver detalle
102: 14.4 MTPA Wildfires
Ver detalle
103: 7.948-12.528 MTPA General transport (road, rail, shipping, air)
Ver detalle
104: 4.34 MTPA Kwinana alumina refinery & related operations
Ver detalle
105: 0.151 MTPA Hope Downs iron ore project
Ver detalle
106: 0.36 MTPA Kalgoorlie nickel smelter/Kambalda nickel concentrator
Ver detalle
107: 0.36 MTPA Boddington and Hedges gold mines, Boddington expansion, and, Gas-fired power station
Ver detalle
108: 7.8 MTPA Alinta gas reticulation network
Ver detalle
109: 0.27 MTPA Hope Downs 4, iron
Ver detalle
110: 0.803 MTPA Kemerton, silicon (addition of 4th smelter)
Ver detalle
111: 0.04 MTPA Koolyanobbing; Mt Jackson J1 Deposit, iron
Ver detalle
112: 0.19 MTPA Marandoo Phase 2, iron
Ver detalle
113: 0.081 MTPA Mt Gibson, iron
Ver detalle
114: 0.032 MTPA Coogee Chemicals
Ver detalle
115: 0.355 MTPA Dampier to Bunbury natural gas pipeline
Ver detalle
116: 2.1 MTPA Three Springs gas fired power station and gas pipeline
Ver detalle
117: 0.12 MTPA Duchess Paradise, coal
Ver detalle
118: 0.75 MTPA Southdown magnetite
Ver detalle
119: 0.231 MTPA Perth Seawater Desalination Plant
Ver detalle
120: Armadale Brickworks
Ver detalle
121: Cardup brickworks
Ver detalle


Lugares de interés (POIs) del Mapa

0: 0.016 MTPA Alkimos waste water treatment plant site A or B

Alkimos waste water treatment plant sites A & B - Water Corporation. Ref'. EPA Bulletins 1238, 1239, Nov 2006, App. 3, Table 3
 
http://epa.wa.gov.au/EPADocLib/2384_Bull%201238%20Alkimos%20Site%20A%20131106%20PER.pdf
 
http://epa.wa.gov.au/EPADocLib/2385_Bull%201239%20Alkimos%20Site%20B%20PER%20131106.pdf


Más sobre 0.016 MTPA Alkimos waste water treatment plant site A or B

1: 12–39 MTPA BLNG Precinct

Woodside Energy Ltd. Proposed common user LNG Precinct (James Price Point) to process gas from the Browse Basin. Total emission for BLNG precinct under 'High Case' scenario is 39 MTPA.
 
Ref. BLNG Precinct Strategic assessment report. Dec 2010, Part 4
 
http://www.dsd.wa.gov.au/documents/Browse_SAR_Part4_Environmental_Assessment_Terrestrial.pdf
 


Más sobre 12–39 MTPA BLNG Precinct

2: 8.391 MTPA Woodside North West Shelf Joint Venture

Operated by Woodside, this is the company's largest operating project in WA. The emissions figure used here is taken from NGER 2009/10 reporting - This is the Australian company total for Woodside which, for all practical purposes, operates solely in WA
 
Ref: http://www.climatechange.gov.au/government/initiatives/national-greenhouse-energy-reporting/~/media/publications/greenhouse-report/nger-publication-0411.pdf


Más sobre 8.391 MTPA Woodside North West Shelf Joint Venture

3: 1.538 MTPA Burrup Fertilisers Pty Ltd (BFPL)

Burrup Fertilisers (BFPL) was developed by Oswal Projects Ltd Group of India, Yara International ASA, is also an equity-holder in the project.

Pankaj Oswal, is Chairman and Managing Director of Burrup Fertilisers Pty Ltd

The plant has a production capacity of 760,000 tonnes of Ammonia annually, the plant is one of the world's largest ammonia production facilities, producing 6% of the total world output of tradable ammonia.

The Government of Western Australia supported the development of the project with an investment of A$160 million in an infrastructure package
 
Project life 25+ years. Ref: EPA Bulletin 1036, Dec 2001, p. 7
 
http://epa.wa.gov.au/EPADocLib/998_B1036.pdf
 
Ref. NGER 2009-10
 
http://www.climatechange.gov.au/government/initiatives/national-greenhouse-energy-reporting/~/media/publications/greenhouse-report/nger-publication-0411.pdf


Más sobre 1.538 MTPA Burrup Fertilisers Pty Ltd (BFPL)

4: 0.084 MTPA Burrup Nitrates Technical Ammonium Nitrate Plant (Under Consideration)

Burrup Nitrates Technical Ammonium Nitrate Plant the main raw material for ANFO (Porous Ammonium Nitrate + Fuel Oil). ANFO is the most widely used and economical civil explosive currently on the market.

Burrup Nitrates Pty Ltd is a 50:50 joint venture between Burrup Holdings Ltd of Australia and Yara International ASA of Norway.

Ref: EPA Report 1379

http://edit.epa.wa.gov.au/EPADocLib/Final%20EPA%20Report%20050111-web.pdf


Más sobre 0.084 MTPA Burrup Nitrates Technical Ammonium Nitrate Plant (Under Consideration)

5: 4.1-8.2 MTPA Woodside Pluto (Under Construction)

It is anticipated that (after 4–10 years of operation) offshore gas compression facilities and the start-up of the second onshore LNG train at Site B will be required. At this point the greenhouse gas emissions are anticipated to increase to 4.1 Mtpa of CO2e based on the current design and a capacity utilisation of 95%. (Woodside 2006)

Woodside are already talking about increasing plant size to 4 trains (press report)
 
Ref: EPA Bulletin 1259
 
http://epa.wa.gov.au/EPADocLib/2533_Bull1259.pdf


Más sobre 4.1-8.2 MTPA Woodside Pluto (Under Construction)

6: 5.45-9 MTPA Gorgon (Under Construction)

Chevron Australia. The EPA notes that the Gorgon development (2 train) would result in significant greenhouse gas emissions, expected to be in the order of 5.25 MTPA after reservoir CO2 is injected.

Sequestration abatement actions are anticipated to yield a greenhouse gas emissions intensity of 0.35 tonnes CO2e per tonne of LNG shipped. The revise the Gorgon development is to expand liquefied natural gas production from 10 million tonnes per annum (MTPA) to 15 MTPA by the addition of a third gas processing train.

It is now reported that they plan to double their production (4 trains at 20 Mtpa production) on Barrow Island leading to potential emissions of around 12 Mtpa. Note the geo-sequestration, if possible, cannot be expanded beyond 4.2 million tonnes of CO2 due to injection constraints into the Dupuy Formation.

Ref: EPA Bulletin 1323 and company EIS
 
http://epa.wa.gov.au/EPADocLib/2937_Rep1323GorgonRevPer30409.pdf
 
http://www.chevronaustralia.com/Libraries/Chevron_Documents/14_greenhouse_gas_emissions_-_risks_and_management.pdf.sflb.ashx
 


Más sobre 5.45-9 MTPA Gorgon (Under Construction)

7: 0.864 MTPA Varanus Is processing hub

Apache Northwest PL. It has facilities for piping oil and gas from various locations within the Harriet and East Spar oilfield.
 
http://en.wikipedia.org/wiki/Varanus_Island
 
No separate CO2e data available. This figure is the company NGER 2009-10 Australian total - for all practical purposes, the company operates only in WA

Ref. NGER 2009-10, p. 5
 
http://www.climatechange.gov.au/government/initiatives/national-greenhouse-energy-reporting/~/media/publications/greenhouse-report/nger-publication-0411.pdf0


Más sobre 0.864 MTPA Varanus Is processing hub

8: 0.33 MTPA Barrow Island, oil

Chevron Oil. No separate CO2e data available. This is the company NGER 2009-10 total - for all practical purposes its Australian operations are in WA.  Includes operations at Thevenard Is.
 
http://www.climatechange.gov.au/en/government/initiatives/national-greenhouse-energy-reporting/~/media/publications/greenhouse-report/NGER-greenhouse-energy-information.pdf


Más sobre 0.33 MTPA Barrow Island, oil

9: Thevenard Island, oil processing hub

No separate CO2e data available - See Barrow Island for Chevron Australia company total (0.33 MTPA).


Más sobre Thevenard Island, oil processing hub

10: 2.3 MTPA Prelude FLNG Project (Under Development)

Shell's Prelude Floating LNG Project is located in Commonwealth waters approximately 200 kilometres off shore northwest Western Australia, in the northern Browse Basin.

The Prelude gas discovery was made in January 2007 and the project is expected to begin production in 2016, making it a fasttrack LNG development.
 
Ref:
http://www-static.shell.com/static/aus/downloads/about_shell/prelude/completeeisdoclowres.pdf


Más sobre 2.3 MTPA Prelude FLNG Project (Under Development)

11: 3.0 MTPA BHP Billiton Scarborough LNG

The proposed BHP Scarborough gas development single train 6 Mtpa million tonnes a year Pilbara liquefaction plant at Onslow emission figures are unknown. Though the work done by Richard Heede of the Climate Mitigation Services in the USA indicates that BHP's Onslow emissions will be around 3 Mtpa. The lease area for the plant site covers approximately 490 ha to accommodate future expansion to four LNG trains. (No predictive assessment concluded)


Más sobre 3.0 MTPA BHP Billiton Scarborough LNG

12: 0.125 MTPA Devil Creek (Under Construction)

Proponent: Apache Energy Ltd

The gas plant would include two gas processing trains with a production capacity of 100 MMSCFD each. Both trains would be run simultaneously to ensure a consistent production of 100 MMSCFD initially, with a maximum capacity of 200 MMSCFD. Greenhouse gas emissions are calculated at 77,000 tonnes per annum for the 100 MMSCFD case, and 125,000 tonnes per annum for the 200 MMSCFD case.

Gas within the Reindeer gas field comprises approximately 3.5% CO2. This is below the threshold of 3.8% CO2 required for sale via the Dampier to Bunbury Natural Gas Pipeline. Therefore, CO2 would
not be released from the gas prior to sales.

Ref: EPA Report 1307
 
http://epa.wa.gov.au/EPADocLib/2839_1307ApacheDevilCreek.pdf


Más sobre 0.125 MTPA Devil Creek (Under Construction)

13: Browse Basin; Argus, gas

No CO2e data available. BHP Billiton.

Ref. DMP Major resource projects map Dec 2010


Más sobre Browse Basin; Argus, gas

14: Browse Basin; Brecknock, gas

See BLNG Precinct. Woodside Energy Ltd.


Más sobre Browse Basin; Brecknock, gas

15: Browse Basin; Calliance, gas

See BLNG Precinct. Woodside Energy Ltd.


Más sobre Browse Basin; Calliance, gas

16: Browse Basin; Cornea, oil

No CO2e data available. Moby Oil and Gas Ltd. Permit WA-342-P contains the Cornea Field, a confirmed oil and gas accumulation which was discovered in 1997


Más sobre Browse Basin; Cornea, oil

17: Browse Basin; Crux, gas

See Prelude FLNG. Nexus (85%), Osaka Gas (15%) [Liquids]; Shell Development Aust. [Gas]. Shell Development Australia holds the rights to 100% of the gas resource within the permit and under the current contract can access the gas in 2021
 
Ref. http://www.australian-shares.com/mining/NXS


Más sobre Browse Basin; Crux, gas

18: Browse Basin; Gwydion, Gas/oil

No CO2e data available. Nexus Energy Ltd. Nexus plans to test a large stratigraphic play concept targeting Jurassic aged reservoir sands south of the Gwydion field.
 
Ref. ASX release 17/11/08
http://www.nexusenergy.com.au/assets/97/Files/668265.pdf
 


Más sobre Browse Basin; Gwydion, Gas/oil

19: 7 MTPA Browse Basin; Ichthys, gas

Inpex.

The Ichthys Project will have an initial capacity to produce 8.4 million tonnes of LNG per annum and approximately 1.6 million tonnes of liquefied petroleum gas (LPG) per annum, as well as 100,000 barrels of condensate per day at peak.

Ref: Draft EIS
 
http://www.inpex.com.au/media/20800/ichthys_eis_ch9.pdf


Más sobre 7 MTPA Browse Basin; Ichthys, gas

20: Browse Basin; Torosa, gas

See BLNG. Woodside Energy Ltd.


Más sobre Browse Basin; Torosa, gas

22: 0.59 MTPA NewGen Neerabup Pty Ltd 330MW Gas-Fired Power Station

NewGen Neerabup Pty Ltd 330MW Gas-Fired Power Station, Neerabup

Ref. EPA Bulletin 1268, p. 16

http://epa.wa.gov.au/EPADocLib/2592_Bull1268_GasFireNeerEPS291007.pdf


Más sobre 0.59 MTPA NewGen Neerabup Pty Ltd 330MW Gas-Fired Power Station

23: 2.7-5.6 MTPA Balmoral South Iron Ore Project (Under Construction)

Proponent: Mineralogy Pty Ltd

The project would be developed in two stages. Stage 1 would cater for 12Mtpa of product and include a 7 Mtpa pellet plant and a 300W power station. Stage 2 would double the capacity to 24 Mtpa with the addition of a second pellet plant and a second power station.

Initially, with stage 1 operational, the proponent estimates greenhouse gas emissions to be around 1.4 Mtpa of CO2e (carbon dioxide equivalent). When stage 2 becomes operational, greenhouse gas emissions would jump to 2.7 Mtpa of CO2e. Over the 31 year project life, emissions are estimated to total 66.6 million tonnes (ave. 2,148,387 MTPA).

Source: EPA Report 1340 and Proponent's GHG Management Plan
 
http://www.epa.wa.gov.au/docs/3043_Rep1340BalSPER51009.pdf
 
http://www.citicpacificmining.com/resources/Greenhouse_Gas_Management_Plan.pdf


Más sobre 2.7-5.6 MTPA Balmoral South Iron Ore Project (Under Construction)

24: 2.6 MTPA Collie; Bluewaters Power Station & Phase II

Griffin Energy Pty Ltd

Ref. EPA Bulletin 1160, Jan 2005, p. 6; EPA Bulletin 1177, June 2005, p. 6

http://epa.wa.gov.au/EPADocLib/1950_B1160.pdf
 
http://www.epa.wa.gov.au/epadoclib/1177/B1177.pdf


Más sobre 2.6 MTPA Collie; Bluewaters Power Station & Phase II

25: 3.1 MTPA Collie; Bluewaters Power Station Expansion Phases III and IV

Proponent: Griffin Power 3 Pty Ltd

Griffin Power 3 Pty Ltd (Griffin Power) is proposing to expand the Bluewaters Power Station facility at Collie by constructing and operating Bluewaters Phases III and IV. Each phase of the Proposal consists of one 229 MW (gross output) base-load sub-critical coal-fired generating unit, located within the Coolangatta Estate approximately 4.5 km from the eastern edge of Collie, Western
Australia. Bluewaters Phases III and IV will be located adjacent to Bluewaters Phase I and II power stations (each 229 MW) and all four phases of the power station will share infrastructure.

The two proposed new units are planned for completion in 2012 and 2014 respectively.

Source: Bluewaters Power Station Expansion Phases III and IV: Greenhouse Gas Management Plan prepared by Strategen Environmental Consultants (July 2009), p. iii
 
http://www.epa.wa.gov.au/epadoclib/1349/Rep1349Blue3_4PER8310.pdf
 


Más sobre 3.1 MTPA Collie; Bluewaters Power Station Expansion Phases III and IV

26: 1.3 MTPA Collie; Muja A&B refurbishment

QON 1414-PETER COLLIER replied:
 
(1) About one million tonnes annually when Muja AB is recommissioned.

(2) Muja AB will contribute approximately 1.2% of the WA's greenhouse gas emissions, based on the state's greenhouse gas emissions (according to the Federal Department of Climate Change) being around 80 million tonnes CO2-e.


and, Inferred from http://www.parliament.wa.gov.au/hansard%5Chansard.nsf/0/9976121b1cdc74a8482576e000151958/$FILE/C38%20S1%2020100302%20p357b-357b.pdf


Más sobre 1.3 MTPA Collie; Muja A&B refurbishment

27: Collie; Muja C&D - see Verve Energy

Verve Energy. No separate CO2e data available. Company total from NGER 2009-10 reporting (8.418 MTPA).
 
Ref.
http://www.climatechange.gov.au/government/initiatives/national-greenhouse-energy-reporting/~/media/publications/greenhouse-report/nger-publication-0411.pdf


Más sobre Collie; Muja C&D - see Verve Energy

28: Collie Power Station - see Verve Energy

Verve Energy. No separate CO2e data available. Company total from NGER 2009-10 reporting (8.418 MTPA).
 
Ref.
http://www.climatechange.gov.au/government/initiatives/national-greenhouse-energy-reporting/~/media/publications/greenhouse-report/nger-publication-0411.pdf


Más sobre Collie Power Station - see Verve Energy

29: 1.971 MTPA Collie B

Collie Power Station Expansion (Collie B). Wesfarmers Energy Limited.
 
Ref. EPA Bulletin 1178, p. 5
 
http://www.epa.wa.gov.au/epadoclib/1178/B1178.pdf


Más sobre 1.971 MTPA Collie B

30: 4.5 MTPA Collie; South West Power Project

Griffin Energy PL.

Ref. EPA Bulletin 1090, p. ii, 2

http://epa.wa.gov.au/EPADocLib/1581_B1090.pdf


Más sobre 4.5 MTPA Collie; South West Power Project

31: 10.328-15 MTPA Wheatstone

Chevron Australia. First production in 2016 of gas coming ashore from the West Carnarvon Basin for LNG production. The estimated life of the project is 40-50 years on current production estimates, with a total lifetime emission of over 500MTPA
 
Higher estimate from press reports.
 
This project alone accounts for approx 1.7% increase in Australia's annual GHG emissions and 13.5% in WA's annual GHG emissions.
 
Ref: EPA Report 1404
 
http://edit.epa.wa.gov.au/EPADocLib/Rep%201401%20wheat%20ERMP%2015611.pdf
 
 
Ref: EIS Chap. 4 Pp 117
 
http://www.chevronaustralia.com/Libraries/Chevron_Documents/Wheatstone_Draft_EIS_ERMP_Volume_I_Chapters_1_to_6.pdf.sflb.ashx


Más sobre 10.328-15 MTPA Wheatstone

32: Van Gogh project, oil

Apache Energy Limited.  No CO2e data available


Más sobre Van Gogh project, oil

33: 3.4 MTPA Perdaman Chemicals and Fertilizers

Perdaman Chemicals and Fertilizers Urea plant (Collie), Planned first production 2013.
 
Ref: EPA Report 1358, May 2010, p. 14
 http://www.epa.wa.gov.au/docs/1358/Rep1358PerdamanPER10510.pdf


Más sobre 3.4 MTPA Perdaman Chemicals and Fertilizers

34: 4.227 MTPA Coolimba Power station

Coolimba Power station (Eneabba) startup 2013
 
Ref: http://www.coolimbapower.com.au/images/stories/pdf/PER/8_-_Pollution_Impacts_v4.pdf


Más sobre 4.227 MTPA Coolimba Power station

35: Agnew (Gold Fields Ltd)

No separate CO2e data available. See St. Ives for full details.
 
Ref: Gold Fields Carbon Disclosure Report, May 2010, p. 13. http://www.goldfields.co.za/pdfs/carbon_footprint/reports/carbon_footprint_2010.pdf
 
Life of mine to 2013. Ref. Gold Fields Agnew gold mine technical short form report, p. 2
http://www.goldfields.co.za/pdfs/technical_short_forms_09/Agnew.pdf


Más sobre Agnew (Gold Fields Ltd)

36: 0.049 MTPA Argyle, diamonds

Rio Tinto
 
Ref. Argyle Diamonds sustainable development report 2009 and 2010, Mar 2011, p. 31.

http://www.argylediamonds.com.au/docs/ARG9260%20SD%20REPORT%202009-10.pdf


Más sobre 0.049 MTPA Argyle, diamonds

37: 0.034 MTPA Australind Titanium dioxide plant

Cristal Global (Millennium Inorganic Chemicals, formerly SCM Chemicals Ltd)
EPA Bulletin 275, May 1987, p. 28
 
http://epa.wa.gov.au/EPADocLib/239_B275.pdf
 
http://www.cristalglobal.com/AboutCristalGlobal_Resources/Bunbury_6_15.pdf


Más sobre 0.034 MTPA Australind Titanium dioxide plant

38: 0.337 MTPA Balla Balla Magnetite

Atlas Iron with Aurox Resources, formerly Ferro Metals Australia Pty Ltd. Ref. EPA Report 1309, Jan 2009, p. 2.
 
Total CO2e emissions divided by life of the mine
 
http://epa.wa.gov.au/EPADocLib/2841_1309BallaEPS5109.pdf


Más sobre 0.337 MTPA Balla Balla Magnetite

39: 0.392 MTPA Binningup Southern Seawater Desalination Project (under construction)

Water Corporation. Ref. EPA Report 1302, Oct 2008, p. 23.
 
http://epa.wa.gov.au/EPADocLib/2797_Rep1302Desal_61008.pdf


Más sobre 0.392 MTPA Binningup Southern Seawater Desalination Project (under construction)

40: 0.22 MTPA Boddington Gold Mine - extended basement operation

Worsley Alumina Pty Ltd. EPA Bulletin 850, Apr 1997, p. 2
 
http://epa.wa.gov.au/EPADocLib/814_B850.pdf


Más sobre 0.22 MTPA Boddington Gold Mine - extended basement operation

41: 0.111 MTPA Brockman Syncline 4 Iron Ore Project

Hamersley Iron Pty Limited (Rio Tinto). Est. 30 years. Ref: EPA Bulletin 1214, Jan 2006, p. 2
 
http://epa.wa.gov.au/EPADocLib/2180_B1214.pdf


Más sobre 0.111 MTPA Brockman Syncline 4 Iron Ore Project

42: 0.105 MTPA Cape Lambert Port B

Pilbara Iron Pty Ltd. Ref. EPA Report 1357, May 2010, p. 16
 
http://www.epa.wa.gov.au/epadoclib/1357/Rep1357CapeLambBPER10510.pdf


Más sobre 0.105 MTPA Cape Lambert Port B

43: 2.188 MTPA Cape Preston - Iron Ore Mine, Downstream Processing (Direct-reduced and Hot-briquetted Iron) and Port, Cape Preston, WA

Austeel Pty Ltd. Minimum 20 years. Ref. EPA Bulletin 1056, July 2002, p. 3
 
http://epa.wa.gov.au/EPADocLib/1344_B1056.pdf


Más sobre 2.188 MTPA Cape Preston - Iron Ore Mine, Downstream Processing (Direct-reduced and Hot-briquetted Iron) and Port, Cape Preston, WA

44: 0.04 MTPA Carina Iron Ore Project

Polaris Metals NL. Greenhouse gas emissions will be produced from burning diesel fuel for power generation, mine equipment and ore haulage. Using formula from the Department of Climate Change National Greenhouse Accounts (NGA) Factors (Australian Government June 2009), the carbon dioxide equivalent (CO2-e) emissions from the project is estimated at 40,000 tonnes CO2-e /yr. This emission level is less than half the 100,000 tonnes per year emissions trigger used by EPA for determining significant emission levels (Globe Environments 2009) and consistent with similar scale mining operations in the region. Accordingly, greenhouse gas emission is not considered to be a significant environmental factor
Ref. CARINA IRON ORE MINE PUBLIC ENVIRONMENTAL REVIEW, Mar 2010, p. 125
 
http://polarismetals.com.au/upload/documents/Carina%20PER/Carina%20PER.pdf
 


Más sobre 0.04 MTPA Carina Iron Ore Project

45: Abra Deposit, Mulgul Project

No CO2e data available. Abra Mining Ltd. (lead-silver-zinc-copper-gold). As of May 2009, joint venture negotiations [with Hunan corp (China)] are continuing - company website, accessed 19/4/11
 
http://www.abramining.com.au/project/?project=13


Más sobre Abra Deposit, Mulgul Project

46: Windimurra V Fe

No CO2e data available. Atlantic Ltd.

Ref: http://atlanticltd.com.au/?id=321


Más sobre Windimurra V Fe

47: Leinster; Waterloo, nickel

No CO2e data available. Norilsk Nickel. On care and maintenance. Ref: Dept. Mines & Petroleum major resource projects map, Mar 2011. Currently the production is suspended for the indefinite period of time due to the deteriorated economic environment and drastic fall of nickel prices [sic].
 
Ref.
http://www.nornik.ru/en/our_products/norilsknickelaustralia/
 


Más sobre Leinster; Waterloo, nickel

48: Laverton; Mt Windarra, nickel

No CO2e data available. Poseidon Resources Ltd. In an agreement with GSM Mining, Poseidon Nickel is hoping it will have the Mount Windarra nickel mine, near Laverton back up and running by 2012.
Australian Mining - 9:34 a.m. Friday 18th February 2011 EST

Ref.
http://www.poseidon-nickel.com.au/index.php?id=68&no_cache=1
http://wotnews.com.au/news/Poseidon_Nickel/
 
 


Más sobre Laverton; Mt Windarra, nickel

49: Leonora; Navigator, gold

No CO2e data available. Navigator Resources Ltd. Annualised production in the range of 40,000-60,000oz of recovered gold. Opened 8 April 2010, closed 15 April 2010 (LA QON 5313, 15 June 2011)

Ref. http://www.navigatorresources.com.au/Projects/Leonora-(Au)
 


Más sobre Leonora; Navigator, gold

50: Kalgoorlie; Carnegie, gold

No CO2e data available. Swan Gold Mining Ltd. On care and maintenance. Includes Riverina, Mulline, Davyhurst, Siberia, Lady Ida and Kunanalling project areas; Swan Gold intends to recommence mining operations at the Carnegie project.

Ref. DMP Major resource projects map, Dec 2010
http://www.swangoldmining.com.au/projects/carnegie-gold.html
 


Más sobre Kalgoorlie; Carnegie, gold

51: Kalgoorlie; White Foil, gold

No CO2e data available. La Mancha Resources (Canada). 2011 expected gold production: up to 64,600 oz.
 
Ref.
 
http://www.lamancha.ca/en/our-assets/australia/white-foil-mine


Más sobre Kalgoorlie; White Foil, gold

52: Kalgoorlie; Blair, nickel

No CO2e data available. Australian Mines Ltd. The Blair nickel mine closed in Dec 2008.
 
Ref.
 
http://www.asx.com.au/asxpdf/20110502/pdf/41yd54q68196xr.pdf


Más sobre Kalgoorlie; Blair, nickel

53: Kambalda; Beta-Hunt, nickel

No CO2e data available. Consolidated Nickel PL. Care and maintenance

Ref. DMP Major resource projects map, Dec 2010
http://investing.businessweek.com/research/stocks/private/snapshot.asp?privcapId=11515527
 


Más sobre Kambalda; Beta-Hunt, nickel

54: Kambalda; Carnilya Hill, nickel

No CO2e data available. Mincor Resources NL. In early June 2007, less than one year after the discovery hole was drilled, Mincor announced formal approval for the development of a $28 million mining project at Carnilya Hill, with initial ore reserves of 483,500 tonnes @ 2.9% nickel. Since then Carnilya Hill has produced 7,900 tonnes of nickel metal contained in 244,000 tonnes of ore at a grade of 3.2% nickel. Mining is expected to continue through until early to mid-2012.
 
Ref. www.mincor.com.au


Más sobre Kambalda; Carnilya Hill, nickel

55: Kambalda; Spargoville, nickel

No CO2e data available. Care and maintenance

Ref. DMP Major resource projects map, Dec 2010


Más sobre Kambalda; Spargoville, nickel

56: 0.2 MTPA Kambalda; St. Ives, gold

Gold Fields Ltd.
 
Ref.
 
http://www.goldfields.co.za/pdfs/carbon_footprint/reports/carbon_footprint_2010.pdf


Más sobre 0.2 MTPA Kambalda; St. Ives, gold

57: 0.187 MTPA Ravensthorpe nickel

First Quantum Minerals (Canada). On care and maintenance. Commercial production is expected in the second half of 2011. Average annual production of nickel metal is expected to be approximately 39,000 tonnes for the first five years after re-commencement of operations and an average of 28,000 tonnes over the mine’s life
 
Ref. EPA Bulletin 930; DMP Major resource projects map, Dec 2010; Company website.
http://www.first-quantum.com/i/pdf/Projects1-2.pdf
 


Más sobre 0.187 MTPA Ravensthorpe nickel

58: Gullewa, gold, copper

Gullewa Ltd. No CO2e data available. Currently on care and maintenance.

Ref. 
 
http://www.gullewa.com/default.asp?id=9
 


Más sobre Gullewa, gold, copper

59: 0.103 MTPA Warramboo Iron Ore Project

Robe River Mining Company Pty Ltd (Rio Tinto). 4.14 kg CO2-e/t. 19-35 Mtpa over life of project (10 years).

Ref. EPA Bulletin 1264.
 
http://epa.wa.gov.au/EPADocLib/2566_Bull1264_170907.pdf

http://www.riotintoironore.com/ENG/operations/2021.asp


Más sobre 0.103 MTPA Warramboo Iron Ore Project

60: Ant Hill, Sunday Hill. Manganese

No CO2e data available. Mesa Minerals (Mineral Resources Ltd). Subject to JV dispute. On care and maintenance.
 
Ref. DMP major resource projects map, Dec 2010


Más sobre Ant Hill, Sunday Hill. Manganese

61: Balline Garnet mineral sands project

No CO2e data availableHaddington Resources Ltd. Construction expected to commence once final regulatory approval has been received.
 
Ref. http://www.dmp.wa.gov.au/documents/Ad_29_Nov.pdf
http://www.alturamining.com/files/announcements/2009/News%20-%20Balline%20Garnet%20Ore%20Reserve%20&%20Mineral%20Resource%20Statements.pdf


Más sobre Balline Garnet mineral sands project

62: Barrambie, vanadium

No CO2e data available. Reed Resources completed a Definitive Feasibility Study (DFS) into the production of vanadium (FeV) from the  Barrambie deposit in May 2009
 
Ref. http://www.reedresources.com/vanadium.php


Más sobre Barrambie, vanadium

63: Beyondie Iron project

Emergent Resources Ltd. Emergent is currently performing metallurgical testwork on 7 core holes drilled in November 2010
 
Ref.
 
http://www.emergentresources.com.au/beyondie-iron-project


Más sobre Beyondie Iron project

65: Bindoon North alumina

No CO2e data available. Bauxite Resources Ltd. Results from the Greenhouse Gas study will be presented to the Office of the EPA and made available to the public
 
Ref. 
 
http://www.bauxiteresources.com.au/download/1342CON-005-FactsSheets-GreenhouseGas.pdf


Más sobre Bindoon North alumina

66: Kanowna, Black Swan, nickel

No CO2e data available. Norilsk Nickel. On care and maintenance.
 
Ref.
 
http://www.nornik.ru/en/our_products/norilsknickelaustralia/


Más sobre Kanowna, Black Swan, nickel

67: 0.057 MTPA Kanowna; Cawse, nickel

Norilsk Nickel. In 2008, the Cawse produced ca. 1,400 tonnes of nickel concentrate. Currently the production is suspended for the indefinite period of time due to the deteriorated economic environment and drastic fall of nickel prices [sic]

Ref. EPA Bulletin 825, p. 29

http://www.nornik.ru/en/our_products/norilsknickelaustralia/


Más sobre 0.057 MTPA Kanowna; Cawse, nickel

68: Bonaparte Basin; Blacktip gas

No CO2e data available. ENI Australia. ENI has started production from the Blacktip gas field. Will deliver gas to the Northern Territory's Power Water Corporation (PWC) for over a period of 25 years, with supply rising to 18,000 boe/day over the life of the contract.
 
Ref.
 
http://www.scandoil.com/moxie-bm2/by_province/australia/eni-starts-production-in-the-blacktip-gas-field-of.shtml
 


Más sobre Bonaparte Basin; Blacktip gas

69: Bonaparte Basin; Audacious, oil

No CO2e data available. PTTEP, Cosmo.
 
Ref.
 
http://www.pttep.com/en/ourBusiness_EAndPprojectsDetail.aspx?ContentID=94&type=2


Más sobre Bonaparte Basin; Audacious, oil

70: Bonaparte Basin; Cash-Maple, gas

No CO2e data available. PTTEP (Acquired from Cue Energy, Mar 2011)


Más sobre Bonaparte Basin; Cash-Maple, gas

71: Bonaparte Basin; Challis/Cassini, oil

No CO2e data available.Santos Ltd.
 
Ref.
 
http://www.santos.com/exploration-acreage/timor-sea.aspx-sea.aspx


Más sobre Bonaparte Basin; Challis/Cassini, oil

72: Bonaparte Basin; Frigate, gas

No CO2e data available. Santos Ltd.
 
http://www.santos.com/exploration-acreage/bonaparte-basin.aspx


Más sobre Bonaparte Basin; Frigate, gas

73: Bonaparte Basin; Petrel, gas

No CO2e data available. Santos Ltd.
 
Ref.
 
http://www.santos.com/exploration-acreage/bonaparte-basin.aspx


Más sobre Bonaparte Basin; Petrel, gas

74: Bonaparte Basin; Tenacious, oil

No CO2e data available. PTTEP, Cosmo.
 
Ref.
 
http://www.pttep.com/en/ourBusiness_EAndPprojectsDetail.aspx?ContentID=94&type=2


Más sobre Bonaparte Basin; Tenacious, oil

75: Bonaparte Basin; Tern, gas

No CO2e data available. Santos Ltd.
 
Ref.
 
http://www.santos.com/exploration-acreage/bonaparte-basin.aspx


Más sobre Bonaparte Basin; Tern, gas

76: Canning Basin; Blina, oil

No CO2e data available. Buru Energy.


Más sobre Canning Basin; Blina, oil

77: Bounty, gold

No CO2e data available. Convergent Minerals Ltd. Convergent continues to progress plans to move all stages to cash flow.

Ref.

http://www.cvg.net.au/downloads/17082010_bountyprojectupdate.pdf

 


Más sobre Bounty, gold

78: 0.02 MTPA Bronzewing-Mt McClure, gold

Navigator Resources Ltd.
 
CO2e emissions inferred at 0.2t/oz gold produced. Opened
 
Ref.
http://www.navigatorresources.com.au/Projects/Bronzewing-(Au)


Más sobre 0.02 MTPA Bronzewing-Mt McClure, gold

79: Canegrass, magnetite

No CO2e data available. Flinders Mines Ltd. Canegrass acquisition represents a further step for Flinders Mines Limited in becoming an iron ore company.
 
Ref. http://www.flindersmines.com/asx/2009/fms_asx20090507.pdf


Más sobre Canegrass, magnetite

80: Canegrass, nickel cobalt

No CO2e data available. Nickelore Ltd. Nickelore acquired Mineral Rights to mine and extract.

Ref. http://www.nickelore.com.au/uploads/file/docs/Nickelore_Calcrete_Discovery_to_Help_Canegrass_Project.pdf


Más sobre Canegrass, nickel cobalt

81: 0.362 MTPA Capel; Synthetic rutile

Iluka Resources Ltd.
 
Ref.
http://iluka.ice4.interactiveinvestor.com.au/Iluka1001/ar2009/en/body.aspx?z=5&p=82&v=1&uid=


Más sobre 0.362 MTPA Capel; Synthetic rutile

82: Pardoo, iron

No CO2e data available. Atlas Iron Ltd. Production 6MTPA ore in combination with Wodgina.

Ref. 'Prospect' Apr-May 2011, p. 28


Más sobre Pardoo, iron

83: Wodgina, iron

No CO2e data available. Atlas Iron Ltd. Opened July 2010 (LA QON 5313, 15 June 2011)
 
Ref.
 
http://www.azomining.com/Details.asp?newsID=2571


Más sobre Wodgina, iron

84: Wodgina, tantalum

No CO2e data available. Global Advanced Metals. There are plans to mine 700,000 lb/ year from Wodgina and have it processed at Greenbushes, as per the Chief Executive officer Bryan Ellis. Closed 26 November 2008 (LA QON 5313, 15 June 2011)

Ref. http://www.azomining.com/Details.asp?newsID=2571
 


Más sobre Wodgina, tantalum

85: Blina, diamonds

No CO2e data available. Blina Diamonds NL. Blina is an extremely active diamond explorer with interests in tenements covering 1750sq km located in the West Kimberley region of Western Australia
 
http://www.blinadiamonds.com.au/about/index.html


Más sobre Blina, diamonds

86: 0.115 MTPA Macedon, gas

BHP Billiton. Ave. over life of field; Connects to Ashburton North onshore gas plant
 
Ref. EPA Report 1360, p. 21


Más sobre 0.115 MTPA Macedon, gas

87: 0.035 MTPA Cliff Head, oil

Roc Oil (WA) Ltd.
 
Ref. EPA Bulletin 1150, Oct 2004, app. 3, p. [3]. Est. lifespan of the project - 15 years
 
http://epa.wa.gov.au/EPADocLib/1909_B1150.pdf
 
 


Más sobre 0.035 MTPA Cliff Head, oil

88: 0.511 MTPA Cloud Break, iron ore

Fortescue Metals Group. At max. prod. rate for duration 12 years; Plus 43, 310 tpa per year for 25 years after mine closure

Ref: EPA Bulletin 1216, p. 4
http://www.epa.wa.gov.au/epadoclib/b1216/2188_B1216.pdf
 


Más sobre 0.511 MTPA Cloud Break, iron ore

89: 0.027 MTPA Ellendale, diamonds

Gem Diamonds. ... a decision was taken in February 2009 to place the E4 pipe on care and maintenance with immediate effect

Ref. EPA Bulletin 1181, p. 8; Company website

http://epa.wa.gov.au/EPADocLib/2049_B1181.pdf
http://www.gemdiamonds.com/b/o_au_ellendale.asp


Más sobre 0.027 MTPA Ellendale, diamonds

90: 1.141 MTPA Munster, cement manufacture

Cockburn Cement (Adelaide Brighton Ltd). Produces 65% of WA used cement (550,000t) and all of quicklime (900,000t). 1t cement = .787t GHG (ADELAIDE BRIGHTON LTD ANNUAL REPORT 2010)
 
Ref. 'Prospect', Apr 2011, p. 20;
http://www.dmp.wa.gov.au/documents/111126_Prospect_April.pdf
 
http://www.adbri.com.au/pdfs/2011/AR/AR2010_Sustainability.pdf
 


Más sobre 1.141 MTPA Munster, cement manufacture

91: 0.078 MTPA Dongara, lime

Cockburn Cement (Adelaide Brighton Ltd). 100,000tpa lime production.  1t cement = .787t GHG (Adelaide Brighton AR 2010)
 
Ref. 'Prospect', Apr 2011, p. 20
 
http://www.dmp.wa.gov.au/documents/111126_Prospect_April.pdf
 
http://www.adbri.com.au/pdfs/2011/AR/AR2010_Sustainability.pdf
 


Más sobre 0.078 MTPA Dongara, lime

92: Kwinana Power Station ... see SWIS

Verve Energy
 
Ref.
 
 http://www.verveenergy.com.au/mainContent/powerStations/Kwinana.html


Más sobre Kwinana Power Station ... see SWIS

93: Cockburn Power Station ... see SWIS

Verve Energy.
 
Ref.
 
http://www.verveenergy.com.au/mainContent/powerStations/Cockburn.html


Más sobre Cockburn Power Station ... see SWIS

94: Kemerton Power Station ... see SWIS

Verve Energy
 
Ref.
 
http://www.verveenergy.com.au/mainContent/powerStations/Kemerton.html


Más sobre Kemerton Power Station ... see SWIS

95: Mungarra Power Station ... see SWIS

Verve Energy
 
Ref.
 
http://www.verveenergy.com.au/mainContent/powerStations/Mungarra.html


Más sobre Mungarra Power Station ... see SWIS

97: Pinjar Power Station ... see SWIS

Verve Energy
 
Ref.
http://www.verveenergy.com.au/mainContent/powerStations/Pinjar.html


Más sobre Pinjar Power Station ... see SWIS

101: 3.18 MTPA Prescribed burns

WA average over 1990-2009
 
Ref.
 
http://ageis.climatechange.gov.au/Reports/2011_2009_ActivityTable_LULUCF.pdf


Más sobre 3.18 MTPA Prescribed burns

102: 14.4 MTPA Wildfires

WA average over 1990-2009
 
Ref:
 
http://ageis.climatechange.gov.au/Reports/2011_2009_ActivityTable_LULUCF.pdf


Más sobre 14.4 MTPA Wildfires

103: 7.948-12.528 MTPA General transport (road, rail, shipping, air)

Higher estimate based on 2010 fuel consumption. Lower estimate from National Greenhouse Gas Inventory
 
Ref.
 
http://www.ageis.greenhouse.gov.au/ANZSIC.aspx
http://www.bitre.gov.au/publications/93/Files/r107.pdf


Más sobre 7.948-12.528 MTPA General transport (road, rail, shipping, air)

104: 4.34 MTPA Kwinana alumina refinery & related operations

Alcoa Australia. In 2009 overall direct emissions for the Kwinana, Pinjarra and Wagerup alumina refineries and the Huntly and Willowdale bauxite mines totalled around 4.34 million tonnes of CO2. For our Western Australian operations this equates to a direct emissions intensity of 0.48t CO? per tonne of alumina.
 http://www.alcoa.com/australia/en/pdf/Sustainability_Report_2009_Final.pdf
 


Más sobre 4.34 MTPA Kwinana alumina refinery & related operations

105: 0.151 MTPA Hope Downs iron ore project

Hope Downs Management Services. 6.06 kg of CO2e/t of ore shipped export at rate of 25 Mtpa. 20 years.
 
Ref. EPA Bulletin 1066
http://epa.wa.gov.au/EPADocLib/1385_B1066.pdf
 


Más sobre 0.151 MTPA Hope Downs iron ore project

107: 0.36 MTPA Boddington and Hedges gold mines, Boddington expansion, and, Gas-fired power station

Worsley Alumina PL/Alcoa of Australia.
 
Ref. EPA Bulletin 1035
 
http://epa.wa.gov.au/EPADocLib/997_B1035.pdf


Más sobre 0.36 MTPA Boddington and Hedges gold mines, Boddington expansion, and, Gas-fired power station

109: 0.27 MTPA Hope Downs 4, iron

Hamersley HMS Pty Ltd. Project life 25-30 years.

Ref. EPA Report 1374

http://edit.epa.wa.gov.au/EPADocLib/Rep%201374%20HD4%20PER%2061210.pdf


Más sobre 0.27 MTPA Hope Downs 4, iron

110: 0.803 MTPA Kemerton, silicon (addition of 4th smelter)

Simcoa Operations Pty Ltd. Silicon Project, Kemerton and Mine at Moora – Addition of a Fourth Submerged Arc Furnace at the Kemerton Smelter.

Ref. EPA Report 1317, p. 2
http://epa.wa.gov.au/EPADocLib/2913_Rep%201317%20Simcoa%20ARI%20310309.pdf
 


Más sobre 0.803 MTPA Kemerton, silicon (addition of 4th smelter)

111: 0.04 MTPA Koolyanobbing; Mt Jackson J1 Deposit, iron

Cliffs Asia Pacific Iron Ore Pty Ltd. Life of mine 10 years.
 
Ref. EPA Report 1347, p. 1, 4
 
http://www.epa.wa.gov.au/epadoclib/3115_Rep1347MtJacksonPER8210.pdf


Más sobre 0.04 MTPA Koolyanobbing; Mt Jackson J1 Deposit, iron

112: 0.19 MTPA Marandoo Phase 2, iron

Hamersley Iron Pty Ltd (Rio Tinto). 15-20 years; 15 million tonnes per annum.
 
Ref. EPA Report 1355, 2010; Rio Tinto website.
http://www.riotintoironore.com/ENG/operations/501_marandoo.asp
http://www.epa.wa.gov.au/EIA/EPAReports/Pages/3174_MarandooMinePhase2.aspx
 


Más sobre 0.19 MTPA Marandoo Phase 2, iron

113: 0.081 MTPA Mt Gibson, iron

Mount Gibson Mining Ltd. 6.7kg CO2-e will be produced per tonne of production; Magnetite production is expected to produce a very high amount of 57.6kg CO2-e per tonne of production; 13 million tonnes of hematite over 8 years and 230 million tonnes
of magnetite over 20 years; CO2e figure derived using lowest emission scenario; Project life approximately 20 years; Website viewed 3/5/11. First ore shipments are expected in the September 2011 quarter.
 
Ref. EPA Bulletin 1242, 2006, p. 4, 9; Mt Gibson website
http://www.mtgibsoniron.com.au/op-extensions.asp
 
http://epa.wa.gov.au/EPADocLib/2395_Bull%201242%20Mt%20Gibson%20PER%20reduced%20271106.pdf


Más sobre 0.081 MTPA Mt Gibson, iron

115: 0.355 MTPA Dampier to Bunbury natural gas pipeline

DBP Ltd.
 
Ref. NGER 2009-10, p. 8
 
http://www.climatechange.gov.au/government/initiatives/national-greenhouse-energy-reporting/~/media/publications/greenhouse-report/nger-publication-0411.pdf


Más sobre 0.355 MTPA Dampier to Bunbury natural gas pipeline

116: 2.1 MTPA Three Springs gas fired power station and gas pipeline

ERM Power Ltd. EPA determination -  "Greenhouse gas emissions managed under an Abatement Plan".
 
Ref. EPA Referral A399888, June 2011


Más sobre 2.1 MTPA Three Springs gas fired power station and gas pipeline

117: 0.12 MTPA Duchess Paradise, coal

Rey Resources Ltd. 20 year project, 2.5Mtpa production.
 
Ref. Environmental referral supporting document June 2011, p. 34
 
http://epa.wa.gov.au/EIA/referralofProp-schemes/Lists/Proposal/Attachments/77/DP%20Referral%20Supporting%20Document_2011%2006%209.pdf


Más sobre 0.12 MTPA Duchess Paradise, coal

118: 0.75 MTPA Southdown magnetite

Grange Resources Ltd. Albany Iron Ore Project - life span minimum 22 years
 
Ref. PUBLIC ENVIRONMENTAL REVIEW, Feb 2007, p. xv, xvii.
 
http://www.epa.wa.gov.au/EIA/prop/Pages/2454_AlbanyIronOreProject-SouthdownMagnetiteProp.aspx
 


Más sobre 0.75 MTPA Southdown magnetite

119: 0.231 MTPA Perth Seawater Desalination Plant

Water Corporation. The power for this plant is derived from the SWIS grid and its emissions are accounted for in the Verve Energy emissions total

 

Ref. EPA Bulletin 1137, p. 3

 

http://epa.wa.gov.au/EPADocLib/1799_B1137.pdf


Más sobre 0.231 MTPA Perth Seawater Desalination Plant

120: Armadale Brickworks

Austral Bricks (Brickworks Ltd.). Brickworks Ltd. total GHG emissions for WA are 42,968 tpa, which figure includes the Armadale, Cardup and Caversham facilities.

 

Ref: Information provided by the company to the Office of Robin Chapple MLC, Aug. 2011


Más sobre Armadale Brickworks

121: Cardup brickworks

Austral Bricks (Brickworks Ltd.). Brickworks Ltd. total GHG emissions for WA are 42,968 tpa, which figure includes the Armadale, Cardup and Caversham facilities.



Ref: Information provided by the company to the Office of Robin Chapple MLC, Aug. 2011