2.7-5.6 MTPA Balmoral South Iron Ore Project (Under Construction) - CO2e Emissions in Western Australia (sitios de interés)

Descripción del sitio

Proponent: Mineralogy Pty Ltd

The project would be developed in two stages. Stage 1 would cater for 12Mtpa of product and include a 7 Mtpa pellet plant and a 300W power station. Stage 2 would double the capacity to 24 Mtpa with the addition of a second pellet plant and a second power station.

Initially, with stage 1 operational, the proponent estimates greenhouse gas emissions to be around 1.4 Mtpa of CO2e (carbon dioxide equivalent). When stage 2 becomes operational, greenhouse gas emissions would jump to 2.7 Mtpa of CO2e. Over the 31 year project life, emissions are estimated to total 66.6 million tonnes (ave. 2,148,387 MTPA).

Source: EPA Report 1340 and Proponent's GHG Management Plan
 
http://www.epa.wa.gov.au/docs/3043_Rep1340BalSPER51009.pdf
 
http://www.citicpacificmining.com/resources/Greenhouse_Gas_Management_Plan.pdf

Mapa del lugar de interés 2.7-5.6 MTPA Balmoral South Iron Ore Project (Under Construction)

Panorámica interactiva con Google Street View

fotografía panorámica de 2.7-5.6 MTPA Balmoral South Iron Ore Project (Under Construction), con el API de Google Street View

Mapas de contenido relacionado