5.45-9 MTPA Gorgon (Under Construction) - CO2e Emissions in Western Australia (sitios de interés)

Descripción del sitio

Chevron Australia. The EPA notes that the Gorgon development (2 train) would result in significant greenhouse gas emissions, expected to be in the order of 5.25 MTPA after reservoir CO2 is injected.

Sequestration abatement actions are anticipated to yield a greenhouse gas emissions intensity of 0.35 tonnes CO2e per tonne of LNG shipped. The revise the Gorgon development is to expand liquefied natural gas production from 10 million tonnes per annum (MTPA) to 15 MTPA by the addition of a third gas processing train.

It is now reported that they plan to double their production (4 trains at 20 Mtpa production) on Barrow Island leading to potential emissions of around 12 Mtpa. Note the geo-sequestration, if possible, cannot be expanded beyond 4.2 million tonnes of CO2 due to injection constraints into the Dupuy Formation.

Ref: EPA Bulletin 1323 and company EIS
 
http://epa.wa.gov.au/EPADocLib/2937_Rep1323GorgonRevPer30409.pdf
 
http://www.chevronaustralia.com/Libraries/Chevron_Documents/14_greenhouse_gas_emissions_-_risks_and_management.pdf.sflb.ashx
 

Mapa del lugar de interés 5.45-9 MTPA Gorgon (Under Construction)

Panorámica interactiva con Google Street View

fotografía panorámica de 5.45-9 MTPA Gorgon (Under Construction), con el API de Google Street View

Mapas de contenido relacionado