0.125 MTPA Devil Creek (Under Construction) - CO2e Emissions in Western Australia (sitios de interés)

Descripción del sitio

Proponent: Apache Energy Ltd

The gas plant would include two gas processing trains with a production capacity of 100 MMSCFD each. Both trains would be run simultaneously to ensure a consistent production of 100 MMSCFD initially, with a maximum capacity of 200 MMSCFD. Greenhouse gas emissions are calculated at 77,000 tonnes per annum for the 100 MMSCFD case, and 125,000 tonnes per annum for the 200 MMSCFD case.

Gas within the Reindeer gas field comprises approximately 3.5% CO2. This is below the threshold of 3.8% CO2 required for sale via the Dampier to Bunbury Natural Gas Pipeline. Therefore, CO2 would
not be released from the gas prior to sales.

Ref: EPA Report 1307
 
http://epa.wa.gov.au/EPADocLib/2839_1307ApacheDevilCreek.pdf

Mapa del lugar de interés 0.125 MTPA Devil Creek (Under Construction)

Panorámica interactiva con Google Street View

fotografía panorámica de 0.125 MTPA Devil Creek (Under Construction), con el API de Google Street View

Mapas de contenido relacionado