Mindola North Shaft (MCM Glencore FirstQuantum) - Zambian Copperbelt (sitios de interés)

Descripción del sitio

Mopani Copper Mines Plc (MCM)
 
Mindola North shaft reserves depleted by 2012

------------------------------------------------------------ 
 
Synclinorium Project Rationale
•  MCM needs to increase its production from the Synclinorium ore body to fill up the void to be created by the closure of Mindola North and Central Shafts.
• The existing hoisting facilities at SOB
Shaft are operating at close to design
capacity and cannot handle the increase
in production.
 
Near Future Scenario
• Mindola North shaft reserves to be depleted by 2012.
• Central shaft reserves to be depleted by 2014.
• Resultant drop in ore production - 1.8Mtpa by 2015.
• 1.8Mtpa will be uneconomical for Mopani

Benefits of Synclinorium Shaft
• Investment of US$206 million
• Extend the mine life by 25 years.
• Creation of 500 jobs during construction.
Benefits of Synclinorium Shaft
• Retention of 2000 plus employees.
• Increase ore production from 3.5 to 5.2Mtpa
• Reduce operational costs through hoisting 5.2Mtpa two shafts instead of
four.

Mapa del lugar de interés Mindola North Shaft (MCM Glencore FirstQuantum)

Panorámica interactiva con Google Street View

fotografía panorámica de Mindola North Shaft (MCM Glencore FirstQuantum), con el API de Google Street View

Mapas de contenido relacionado