Descripción del sitio
Built in cooperation Serbia-Romania, opened in 1972. It is the largest dam on the Danube and one of the largest hydroelectric power plants in Europe. It is 60 meters high and more than a kilometer in length. Its power capacity is divided between Romania and Serbia, with Romania having an installed capacity of 1.16 GW.