Descripción del sitio
39 29’N134 27’E
水深1,928m
穴4こ
The 180 nmi distance to Site U1425 was covered in 17.6 h at an average speed of 10.2 kt. The sea passage ended at 0230 h on 28 August.
The positioning beacon was recovered during the pipe trip and was back aboard after lunch on 2 September. The BHA was set back in the derrick and the vessel was secured for transit to Site U1426 (proposed site YB-2). This ended operations at Site U1425 (YR-1)